Under constructionPlum Condo East Ladprao
พลัมคอนโด อีสต์ ลาดพร้าว
Lat Phrao Soi 102, Lat Phrao, Bangkok · Lat Phrao
Starting from
฿1.88M
23.25-34.85 sqm
2027
- ✦ 250m from MRT Lat Phrao 83 on the Yellow Line
- ✦ Low-rise condominium, 8 floors across 2 buildings, 455 units total
- ✦ Modern Moroccan design concept close to expressway access
- ✦ EIA-stage project; construction expected to start Q2 2026, complete Q2 2027
Unit types
Facilities
Tracking history
Tracked since July 23, 2026. Price, construction and status are checked every two days.
- 2026-07-23Price: ฿1.98M → ฿1.88M
AI Investment Insights
62
/100
Investment score
Plum Condo East Ladprao offers an affordable, transit-proximate entry point in a rapidly improving corridor thanks to the new Yellow Line, making it a reasonable rental play despite Pruksa's mass-market positioning and pre-construction risk. Investors should weigh the 2027 completion timeline and modest unit scale against the strong location fundamentals.
Strengths
- Just 250m from MRT Lat Phrao 83 on the newly operational Yellow Line
- Affordable entry price (~THB 1.98M) with attractive price-per-sqm for the corridor
- Small, investor-friendly 1BR/2BR unit mix suited to rental demand
- Located in a growing transit corridor with strong district-level momentum
Watch out for
- Pruksa is a mass-market developer with a mixed reputation for finishing quality
- Project is still at EIA stage with construction not yet started (completion risk to 2027)
- Low-rise, 8-floor development limits scale of facilities and unit variety
- Small unit sizes (23-35 sqm) may cap long-term capital appreciation potential
AI analysis · claude-sonnet-5 · August 19, 2026 · AI-generated analysis based on public data. Not investment advice — verify with the developer before deciding.
🧮 True-cost & yield calculator
For foreign buyers paying cash. Adjust any assumption — estimates only.
Tax is simplified — confirm with a tax adviser.
Total acquisition cost
฿1.94M
Net annual rental income
฿64K
Net yield
3.3%
Payment schedule
Email me this breakdown
All figures are estimates from adjustable assumptions — not investment advice. Verify every cost with the developer and independent advisers.
