← Back to map explorer
🏢
Supalai Veranda RamkhamhaengUnder construction
SupalaiCondominium🚉 MRT Orange Line (Rajamangala Stadium)

Supalai Veranda Ramkhamhaeng

ศุภาลัย เวอเรนด้า รามคำแหง

Ramkhamhaeng Road, Bang Kapi, Bangkok · Ramkhamhaeng

  • Directly adjacent to Rajamangala Stadium MRT Station (Orange Line)
  • 1km to Ramkhamhaeng University; 1.3km to Assumption University (Hua Mak)
  • Large-scale 3-tower development, 2,098 units (33/35/27 storeys)
  • Two-way access via Ramkhamhaeng and Hua Mak roads to bypass traffic
  • Active-lifestyle facilities including sky lounge and multiple pools

Unit types

Studio1BR1BR+2BR

Facilities

Swimming PoolSky loungeFitnessClubhouseKid’s PoolKid’s RoomMulti-purpose RoomCo-working space

Construction progress

90%

Expected completion 2026

AI Investment Insights

64

/100

Investment score

Location6/10
Value7/10
Developer7/10
Transit8/10
Est. gross rental yield: 4.56% per yearGrowth outlook: HighSuits: Rental investor · Own-stay buyer

Supalai Veranda Ramkhamhaeng offers solid fundamentals with direct access to the future Orange Line and a university catchment, at a reasonable entry price backed by high construction progress. The large unit count and small-format mix suit rental or own-stay buyers, though oversupply and pending transit completion temper near-term upside.

Strengths

  • Directly adjacent to the under-construction Rajamangala Stadium MRT Orange Line station, offering strong future connectivity
  • Walking distance to Ramkhamhaeng University and Assumption University (Hua Mak), ensuring steady rental demand
  • 90% construction progress significantly reduces delivery risk versus typical off-plan projects
  • Supalai is a large, SET-listed developer with a strong track record of completing large-scale projects

Watch out for

  • Very large supply (2,098 units across 3 towers) may create rental and resale competition within the same project
  • Small unit sizes (28-67 sqm) limit rental income ceiling and buyer pool for larger families
  • Orange Line is still under construction, so full transit benefit and value uplift will take time to materialize

AI analysis · claude-sonnet-5 · 2026-07-09 · AI-generated analysis based on public data. Not investment advice — verify with the developer before deciding.